Phones answered 24/7Waukesha, WI
Call (833) 751-2102
(833) 751-2102
Serving Waukesha County

Asphalt shingle roof replacement for Waukesha houses

The old covering is removed to the deck, the boards are checked and repaired, and a new shingle system goes on with underlayment, edge metal and ventilation planned as one assembly.

  • Leaks, flashing and tear-offs
  • Ice dams and snow load
  • Wind and storm damage

Get a fast quote

Fastest: call (833) 751-2102. Or send this and we call you back.

Shingle Replacement

Shingle Roof Replacement: what it covers

Quick answer

Shingle roof replacement strips the existing covering down to the deck, checks and repairs the sheathing, then installs new underlayment, edge metal and an asphalt shingle system. It is the right answer when the old roof has reached the end of its service life or when the damage is spread across most of the slopes.

Shingle Roof Replacement illustration for Waukesha, WI

Asphalt shingle is the common residential covering in general terms, and it is the material most homeowners picture when they think about a replacement. The research for this site does not give a figure for the mix of roof types by town, so no share is claimed here. A shingle roof is simply the common case, and most replacement questions begin with one.

A replacement is a bigger decision than a repair, because it changes the whole covering at once. The old shingles come off, the deck is inspected board by board, and the underlayment and edge metal are put back in a sequence that the shingle manufacturer's instructions and the local building department's rules both have to accept. The new roof is only as good as the deck under it.

The first step is a conversation with Waukesha Roofing, usually by phone at (833) 751-2102, followed by a visit to the roof and the attic. The visit decides whether the roof can be overlaid, whether a tear-off is needed and what the deck has to look like before the new material goes down.

Service area
Waukesha & Waukesha County
Availability
Phones answered 24/7
Warning signs

Signs you need shingle roof replacement

A tear-off creates a great deal of dust, nails and falling debris, and the crew needs a fall-protection plan for the whole slope. Keep children and pets out of the work area, and do not walk the new underlayment before it is covered, because it is slippery and not designed to bear weight in the open.

  • Granules that come off in handfuls and collect in the gutters
  • Curled, cupped or clawed shingle edges across most of a slope
  • Shingles that crack when they are lifted, even on a mild day
  • Several leaks in different places after the same kind of storm
  • A roof that has already had two layers of covering on it
  • Dark or soft spots on the decking visible from the attic
Our process

How our shingle roof replacement visit works

  1. Confirm the roof can be replaced

    The layer count, the deck condition and the framing are checked first, because a new covering on a failing deck tends to fail early. The inspection also notes any area where the structure needs support, and the homeowner gets that information before the work is scheduled.

  2. Strip the old covering

    The existing shingles, underlayment and old flashing come off to the deck. The removal is done in a way that keeps debris contained, and the drip edge and any metal that is still sound are kept for reuse where the details allow it.

  3. Repair and prepare the deck

    Soft or rotted boards are cut out and replaced to the nearest framing. Nails are checked and reset, and the deck is swept clean so that the new underlayment lies flat and the shingles seat on a surface that will not telegraph bumps through the roof.

  4. Install the underlayment and edge

    The underlayment is laid in courses from the eave upward and lapped correctly, with the eave and valley areas given extra protection. Drip edge goes on at the rake and the eave, so the water leaves the roof at the right line and does not run behind the fascia.

  5. Lay the shingles and the ventilation

    The shingles are installed to the manufacturer's exposure and nailing pattern, with the ridge vent and any other vents set in the same pass. The ventilation is planned with the attic in mind, so the new roof does not trap the moisture the old one let out.

  6. Clean up and walk the result

    The site is cleared of nails and debris, and the roof is walked with the homeowner. Flashing, vent boots, the valley and the ridge are shown, and a written note records what was installed, so the next person who looks at the roof knows what is there.

Job stories

Typical jobs for shingle roof replacement

Typical job
Illustration: A typical multi-layer tear-off in Hartland

A typical multi-layer tear-off in Hartland

What homeowners notice
A homeowner wants a new covering, but the roof has been recovered twice over the years, and the eave boards feel soft when pressed from the ground.
What we do
The crew confirms the layers from the attic and at a cut edge, then removes the coverings down to the deck. Soft boards at the eave are cut out and replaced, and the decking allowance on the scope is drawn on for a short run of them, with each board recorded.
What to expect
The findings record the number of layers removed, the boards replaced and the ones left in place, each with a photograph. The scope and the final record match, and the homeowner keeps both with the house papers.

When is a replacement the right answer?

A replacement is the right answer when the covering is at the end of its life, when repairs have become frequent in different places or when the deck is damaged across a wide area. Age matters, but the condition of the shingles and the deck matters more than the year on the calendar.

Granule loss, curling, cracking and a shingle that will not lie flat are signs that the material has lost most of its ability to shed water. A roof with these signs over most of its slopes is a replacement candidate, even if no leak has yet appeared in the house.

The decision is also shaped by what the house needs next. A roof that will be replaced in a few years anyway may be better patched for the time being, while a roof that is causing damage every winter should be replaced before the damage spreads to the framing and the ceilings.

What does the state require for the work?

Wisconsin's Department of Safety and Professional Services runs a dwelling contractor credential. For a one- or two-family dwelling, a permit holder must hold a Dwelling Contractor or Dwelling Contractor Restricted certification or employ someone who holds the qualifier credential, under the state administrative code.

The research for this site confirmed that requirement from the department's pages and the administrative code. It did not confirm how the requirement applies to a roofing job specifically, so this page does not state a roofing category, a course requirement or a renewal rule. The department's pages are the place to check how a particular job is classified.

A permit for a roof replacement is a separate question from the credential. The local building department in each village or city decides whether a permit is needed and what it covers. The research did not establish those rules or the fees for any town in Waukesha County, so the answer for a particular house comes from that office.

What makes a shingle system last?

A shingle system lasts when the deck is sound, the underlayment is continuous and the shingles are nailed and exposed as the manufacturer directs. Ventilation and flashing complete the system, because a shingle that is installed well on a deck that cannot breathe will still fail early.

Shingles are only one layer of a roof. The underlayment is the second line of defense against wind-driven rain, and it is the layer most often skipped in a rushed job. Each course must be lapped correctly over the one below, and the laps at the valleys must be laid so water runs across them and not into them.

Nail placement is also part of the system. Nails that are set too high, too few or driven through the shingle at an angle will loosen in the first wind, and the shingle loses its seal. A crew that follows the manufacturer's nailing pattern is following a spec that exists for the wind and the snow the roof will meet.

How do I choose the shingle itself?

A good choice is an architectural asphalt shingle with a heavier profile and a warranty that matches the expected life of the roof. The color, the weight and the wind rating are the points to compare, and the homeowner should ask for the product's specification in writing.

Architectural shingles are thicker than the older three-tab style and show a textured surface and shadow line. They are generally heavier and more tolerant of wind and handling, though the manufacturer's rating governs how any one product performs.

The shingle should be chosen with the existing roof in mind. A new color can look very different beside an old roof on a neighbor's house, and the roof's pitch and the house's exposure to sun decide how the color ages. A sample board on the house before ordering is a sensible step.

Options

Types and options for shingle roof replacement

Full tear-off to the deck

The standard approach when there is more than one layer of covering, when the deck is in doubt or when the roof has leaked in several places. It gives the best view of the deck and the chance to repair it, and it avoids putting new material over old problems.

Overlay on a sound single layer

An overlay puts new shingles over a single sound layer, and it avoids the tear-off and the disposal that come with it. It is only suitable when the existing layer lies flat, the deck is sound and the local building rules allow it. The inspection decides which of these is true.

Partial replacement of one slope

A single slope can be replaced when the damage is confined to it and the remaining slopes are in good shape. The new material has to be matched to the old as closely as possible, and the transition at the ridge and valley is planned so that the two sections shed water as one roof.

Replacement with new flashing and penetrations

A full replacement is the moment to renew the flashing at walls, chimneys, skylights and vent pipes. Old metal and boots are usually brittle by then, and replacing them with the new roof avoids a second visit to the same details.

Ice and water protection at the eave

Self-adhering membrane is laid at the eave, and in valleys and around penetrations, to protect against water that backs up behind an ice dam. Where the house has a history of ice ridges, the membrane is extended farther up the slope.

Waukesha County

Why shingle roof replacement is different in southeastern Wisconsin

Replacement work in Waukesha runs through the same questions as anywhere in the county: deck condition, layer count and how the attic is ventilated.

Houses on the older blocks often carry more than one covering, and the tear-off is usually the honest choice on those roofs.

A new roof on a house with an old attic is only half the job, because ventilation and insulation decide how the new covering behaves in January.

Skip the guesswork. Call for a straight answer.

Tell us what's happening and we'll tell you honestly whether it's a quick fix, and what shingle roof replacement should cost.

Related

Roof Replacement

The whole roof assembly is replaced as a system, with the deck repaired, the attic ventilation corrected and the permit and credential questions answered before the old covering is removed.

Metal Roof Installation

Metal panels are measured, fastened and sealed to a deck that has been checked for the snow and wind the roof will carry, with the edges, penetrations and snow-sliding zones designed in from the start.

Leak Diagnosis and Flashing Repair

The leak is traced from the stain back up the water path to the flashing or joint that failed, and the repair is made at that point and checked after the next rain.

Roof Inspection Report

The roof, the attic, the flashing and the gutters are inspected and recorded in a written, photographed report that a buyer, an insurer, a lender or the owner can read without the inspector present.

Guides

Read before you book

Repair or replace: the signs a Waukesha roof gives

The decision turns on the roof's age and its layers, the condition of the attic and the decking, how often repairs have been needed, and whether storms or ice have already done lasting harm.

FAQ

Shingle Roof Replacement FAQs

Can I put a new roof over the old one?

Sometimes. An overlay is possible over a single sound layer that lies flat, if the local rules allow it and the deck is in good condition. Two layers, soft decking or a visible sag mean the old covering has to come off so the deck can be checked and repaired.

How long does a shingle roof last?

The life of an asphalt shingle roof depends on the product, the deck, the attic ventilation and the weather it meets. A roof that is installed well and ventilated properly can last well beyond the warranty of a basic product. The inspection gives the life a particular roof can expect.

What is the difference between a tear-off and an overlay?

A tear-off removes the old covering to the deck so the deck can be inspected and repaired. An overlay goes over a single layer that is left in place. The tear-off takes more time and makes more debris, but it allows the deck to be checked, which an overlay does not.

Who handles the permit?

The local building department in the village or city where the house sits decides whether a permit is needed and issues it. The roofing crew should confirm the permit status before the work starts, and the research did not establish the rules for each town in this county.

Will the color match my neighbor's roof?

It depends on the age of the neighbor's roof and the product it has. Weathered shingles rarely match new ones, and a new roof will look different for a season or two as it weathers. A sample board on the house is the most reliable way to check.

Can you install a roof in winter?

Shingle work in cold weather is slower and more careful, because the sealant does not bond well in low temperatures and the material is more brittle. The crew decides when conditions allow the work to be done properly, and the schedule is set around that.

WhatsApp